
Construction dumpster rental in Houston
Need a reliable roll-off for Houston jobsites? A 30-yard container keeps crews moving: swap-outs available, driveway boards set on arrival, and the dumpster stays clean.
Jobsite Roll-off Containers for General Contractors
Our construction fleet deploys 20-, 30-, and 40-yard roll-off bins across Houston and Harris; these units feature reinforced steel sidewalls, steel bottom rollers, and walk-in rear swing doors for framers, roofers, and demo crews. We set every container on protective driveway boards to guard your property—call (281) 603-1381 for contractor pricing and tonnage rates on multi-phase hauling agreements.

20-yard construction roll-off
A 20-Yard Roll-Off Container measures 20 ft long, 7 ft wide, and 4 ft tall with 2 tons included in the flat rate.
The 20-yard container fits kitchen and bath remodels, single-room demo, and small framing jobs in tight spaces.

30-yard construction roll-off
The 30-yard roll-off runs 22 feet long, 8 feet wide, and 6 feet tall, with about 4 tons included for your debris.
The 30-yard container holds whole-house remodels, additions, and new-build framing with high walls for bulky drywall and lumber.

40-yard construction roll-off
The 40-Yard Roll-Off is 22' L x 8' W x 8' H and includes up to 5 tons of debris on the haul.
Sized for commercial builds and large tear-outs, the 40-yard container is the largest roll-off staged on active jobsites.
Construction Debris, Drywall, Lumber Acceptance
Our roll-off containers accept the full range of mixed C&D debris: framing lumber, drywall, plaster, subfloor, insulation, packaging, pallets, and light metals. These loads are sorted at the Houston transfer station to maximize recovery — contractors on steady jobs often manage these flows through commercial recurring hauling agreements. You can follow EPA construction debris recycling guidance to ensure your site stays compliant with local sorting rules.
- ✓ Framing lumber and offcuts
- ✓ Drywall, plaster, lath
- ✓ Subfloor and sheathing
- ✓ Insulation and vapor barrier
- ✓ Mixed packaging and pallets
- ✓ Light metals and conduit


Concrete, Brick, and Asphalt Heavy-debris Pricing
Dense materials like concrete slab tear-out, brick demo, asphalt millings, or clean dirt need a heavier-duty container. Our reinforced-steel lowboy roll-offs hold up to 10,000 pounds of debris per haul. The 2-to-3-foot side walls let skid steers and wheelbarrows dump right in without pushing past USDOT weight limits on Houston routes.
Heavy-debris jobs run on weight tickets from the scale house, not on the yard; the cleanest loads — with no mixed wood, drywall, or trash in them — earn the lowest per-ton rate, and the rest are billed by the tonnage. I size your container and dispatch the dumpster after talking to your site super.
Tonnage Limits and Weight Overage Policy
Every construction roll-off ships with a set tonnage allowance: the weight is clearly listed on your upfront quote. Additional weight is billed at our per-ton overage rate against the scale-house ticket; we weigh the truck upon return—no surprises. Please request specific roofing tear-off jobsite containers for shingle disposal, because heavy roofing material should not eat into your standard mixed-debris weight limit.
20-yard
3 tons
Included tonnage. Mixed C&D debris.
30-yard
4 tons
Included tonnage. Mixed C&D debris.
40-yard
5 tons
Included tonnage. Mixed C&D debris.
On-site Swap-out and Dispatch Coordination
Multi-week projects run on a swap rhythm, not single drops; text or call dispatch when your container is full — we’ll roll a fresh roll-off to the exact staging pad by end of day or next business day across Houston and Harris.
Step 1
Text dispatch when full
Site supers text a photo and the container number to the dispatcher — no portal logins, no ticketing.
Step 2
Same- or next-day swap
We haul your loaded container and drop an empty in one stop so crews keep hauling without a loading delay.
Step 3
Weekend dispatch available
Saturday pulls keep Monday starts clean; coordinate Friday afternoon for weekend turns.

Insurance and Contractor Account Setup
We handle the paperwork up front: certificates of insurance issued to the GC or the property owner; net-30 contractor accounts with consolidated monthly billing across Houston active sites — the hooklift fleet stages the recurring bins and that means the account spins up in a single call with dispatch.